Power Invest

1,700 MW Petroleum Development

O&M of PDO power stations since 2000 (total installed capacity in excess of 1,700 MW ). Scope includes all preventative and corrective maintenance of the power generation equipment as well as all scheduled maintenance.

Date

28 Aug 2019